CMA CMA InternationalAayan Technical Co. Ltd · Jeddah
Start an enquiry →
Saudi approvals · guide

Civil Defense approval on a fit-out.

In Saudi Arabia the General Directorate of Civil Defense checks fire and life safety. Its Salamah platform handles safety licensing for commercial premises. On a fit-out that means fire and life-safety drawings, approved systems and materials, an inspection, and a valid safety certificate before the premises trade.

01Civil Defense (Salamah)

What Civil Defense looks at on a fit-out.

Exits

Number, width and travel distance of exits, and clear routes to them.

Sprinklers

Head layout after the new ceiling and partitions go in, with no heads blocked.

Detection and alarm

Detectors, call points and sounders tied into the building or mall system.

Emergency lighting and signs

Emergency luminaires and exit signs that work on battery backup.

Fire-rated construction

Rated walls, doors and penetrations where the design needs them.

Kitchens

Suppression over cooking lines and safe extract routes.

02Process

The steps,
in order.

  1. Design the safety package

    An accredited safety or engineering office prepares fire and life-safety drawings where the activity requires them.

  2. Use accepted systems

    Fire systems and installers must meet Civil Defense requirements. Check before you buy.

  3. Build and test

    Install to the approved drawings, then test alarms, emergency lighting and suppression.

  4. Apply and inspect

    Apply through Salamah and prepare for the site inspection.

  5. Keep it valid

    Safety certificates have a validity period. Renew on time and re-check after any change to the layout.

03Questions

Civil Defense (Salamah).
Straight answers.

Does every fit-out need Civil Defense approval?

Most commercial premises need a valid safety certificate to trade. In a mall, changes to the landlord's fire systems also need approval. Check the current rule for your activity on Salamah.

What is the Salamah platform?

It is the Civil Defense e-platform for safety licensing of facilities in Saudi Arabia. Applications and certificates run through it.

Who prepares the fire and life-safety drawings?

An accredited safety or engineering office, where the activity requires one. We coordinate with them and build to their approved drawings.

What makes a fit-out fail the inspection?

Common causes are blocked exits, sprinkler heads covered by ceiling features, missing emergency lighting and unapproved materials.

Is this page official guidance?

No. It is general guidance from a fit-out contractor. Civil Defense and its platform have the current rules.

Send the drawings.
We will send a date.

Unit area, mall or building, target handover date, fit-out manual. That is enough to price it.

Aayan Technical Company Limited · 6933 Al Aliyah, Al Rehab, Jeddah 23343, Saudi Arabia · Saudi Commercial Registration

04Related

General guidance from a fit-out contractor, checked 8 October 2026. Rules change. Always confirm the current requirement with the authority or platform named above before you design or apply.